New OpenStack Release
Hi,
This is mostly for Chris.
I think we should just wait until Tues to start working through these. It'll just be easier to work together since I'm out on Monday. Anyway I'm going to share steps with you here. It should be pretty simple at this point since it really should be bug fixes and shouldn't be many new dependencies.
We'll track things with this spreadsheet. I have it set up for RC1. Final releases should be coming out next week though. Depending on what's available from upstream on Tues, we may upload some RCs that have larger deltas (to verify the build) and then upload the final release a day or 2 after. Spreadsheet
Note: If uscan fails you may need to first update debian/watch to get the release tarball from opendev.org (see aodh).
Example of steps taken for aodh to pick up rc1 release:
git clone lp:~ubuntu-server-dev/ubuntu/+source/aodh
cd aodh
git checkout pristine-tar
git checkout upstream
git checkout master
uscan --verbose --download-version 10.0.0~rc1 --rename
gbp import-orig --no-interactive --merge-mode=replace ../aodh_10.0.0~rc1.orig.tar.gz
dch -i
sed -i "1s/1ubuntu1/0ubuntu1/" debian/changelog
# again see aodh as an example
debcommit -a # this will commit the changes with a git log that is the same as your changelog in d/changelog
# check the git log to see what changes are in new release - ie.
git diff HEAD~2 HEAD~1
# update debian/control based on any new requirements in the new release
# if debian/control updated then also update debian/changelog with " * d/control: Align (Build-)Depends with upstream."
# it'll take some time to understand what's actually needed here or not.
# doc requirements.txt and test-requirements.txt go in Build-Depends-(Indep) and
# run time requirements.txt generally go in Build-Depends-(Indep) and Depends.
# accuracy of build-depends are not quite as important as run-time depends.
# again
debcommit -a
Next, try to build the source package: gbp buildpackage -S -sa
if patches fail to apply it's possible they need to be rebased or perhaps they landed upstream recently and can be dropped from d/patches. useful commands: quilt push, quilt edit, quilt refresh, quilt pop. if making patch changes, again update d/changelog with details and use debcommit -a to commit.
Finally when ready to upload to the testing PPA I'm using: ~/src/scripts/ppa/ppa_upload.sh --yes -d focal --upload ppa:openstack-ubuntu-testing/ussuri ../build-area/aodh_10.0.0~rc1-0ubuntu1.dsc
But for you, for now at least, if you can push all branches (upstream, pristine-tar, master) and all tags (git push --all && git push --tags) to your own namespace on launchpad then I can merge those into the ubuntu-server-dev repos and push them to the ppa for you.
I think what we will do is keep the changelogs UNRELEASED until final release since we're just upload to the testing ppa for now. At that point we can release/tag and upload groovy (from master branches), and then cut stable/ussuri branches and adjust the package version slightly so that groovy supsercedes focal, then release/tag and upload focal to the focal unapproved queue where the SRU team will review and accept.
Does that all make sense?? :)
Thanks, Corey